A waterproof board with factory-fitted hangers for fast, consistent fixing to the primary lining before seam welding.

Representative photo of Hanger-Type Tunnel Waterproof Board; final surface, width and roll length are confirmed at order.
| Structure | Waterproof board with pre-bonded hanger straps at 0.5-1.0 m spacing |
| Material | EVA or HDPE |
| Thickness | 1.0 / 1.2 / 1.5 / 2.0 mm |
| Width & roll | 2-4 m width; 20-30 m roll |
| Strap tensile | ≥ 8 kN per strap |
| Standard | GB/T 18173.1 |
Typical production ranges for Hanger-Type Tunnel Waterproof Board; project values are confirmed against the drawing and test report before shipment.
Request data sheet & quoteFast fixing to primary lining in mined tunnels. The material package around Hanger-Type Tunnel Waterproof Board — cushion geotextile, drainage, anchoring and welding — is selected with the same drawing.
Hanger fixing speeds installation and controls spacing, but the hanger pattern must match the lining. Standard board with adhesive or washer fixing is used where hangers are not specified.
Compare with my specificationHefei metro tunnel waterproofing — 1.5 mm EVA waterproof board, hanger fixed. Reference configuration for Hanger-Type Tunnel Waterproof Board, not a delivered project record.
Reference configurations, not delivered project records.
A waterproof board with factory-fitted hangers for fast, consistent fixing to the primary lining before seam welding.
Final thickness, width and surface are confirmed against the drawing, design head and chemical exposure.
Welding parameters and seam records for Hanger-Type Tunnel Waterproof Board are supplied with the shipment; for the first production welds, an engineer can attend site.
Hangers hold the board at a consistent spacing, reduce manual support and allow welding to proceed in a planned sequence. The fixing pattern is confirmed against the primary lining survey.
EVA is flexible and welds easily at low temperature, widely used in tunnels. HDPE has higher chemical resistance and is used where aggressive groundwater is expected.
Seams are inspected visually and with vacuum or air testing according to the tunnel waterproofing specification.
A board with factory-fitted hangers that allow fast fixing to the primary lining before welding, improving installation speed and consistency.
Other products in the waterproof board range, plus the eight material systems used around Hanger-Type Tunnel Waterproof Board.
Tunnel Waterproof Boardtunnel crowns and walls requiring flexible, easy-weld sheets
Tunnel Waterproof Boardtunnels with aggressive groundwater and higher chemical resistance needs
Fill what you know. The button creates a structured email in your mail app; nothing is stored on this website.
Send the specification values, area, head and delivery port for Hanger-Type Tunnel Waterproof Board; we will confirm the standard and reply with a material schedule.