Seepage control for oxidation ponds, septic tanks, manure lagoons and agricultural wastewater storage, with attention to sludge, algae and access.
Oxidation ponds and septic lagoons are often large, irregular and built in stages. A 1.0-1.5 mm HDPE liner with a geotextile cushion provides a practical barrier; slopes need texture or benching where sludge accumulates. Perimeter anchoring and inlet/outlet penetrations are the usual leak paths and should be detailed before welding.
The layer sequence is a starting point. Final thickness, cushion and drainage are confirmed against the design head and chemical exposure.
Welding parameters and seam records are supplied with the shipment; an engineer can attend the first production welds for critical projects.
The package above is a typical starting point. The final layer sequence, thickness and cushion are confirmed against the design head, subgrade and chemical exposure.
Pipe boots, reinforced patches and extrusion welds are used at penetrations and corners. These details are agreed before installation, because they are the most common leak paths.
Yes. Send the drawing, specification clauses and bill of quantities. We will map the items to standard products and flag any value that needs a custom run.
The same material system behaves differently in each application. Browse the other eleven guides for the layer sequence and details that matter there.
Send the drawing, area, head and exposure. We will propose the layer build-up and a bill of materials.