Hazardous Waste Landfill

Double-liner containment for hazardous and industrial waste landfills, with primary and secondary HDPE membranes, GCL, leachate detection and strict seam QA.

Site conditions

Site challenges

Hazardous waste landfills require a double-liner system: a primary 2.0 mm HDPE membrane, a secondary 1.5-2.0 mm membrane or GCL, and a leachate detection layer between them. Every seam is tested and recorded, and penetration details are reviewed before installation. Hengyang supplies the membrane, GCL and cushion geotextile, and supports the QA dossier required for acceptance.

Hazardous Waste Landfill

Where containment systems fail

  • Subgrade not accepted, or cushion missing under the sheet
  • Penetrations, corners and anchors detailed after installation
  • Welding outside the day's trial-weld window
Typical package

Material build-up

  • 2.0 mm primary HDPE geomembrane
  • 1.5-2.0 mm secondary liner or GCL
  • 600 g/m² geotextile cushion
  • Leachate detection and drainage layer

The layer sequence is a starting point. Final thickness, cushion and drainage are confirmed against the design head and chemical exposure.

What to confirm before quoting

  • Design head, slope and anchor detail
  • Subgrade condition and required cushion
  • Chemical and UV exposure
  • Acceptance standard and seam-testing method
Installation

Installation sequence

  1. Accept the subgrade and record the inspection
  2. Place cushion geotextile and drainage where specified
  3. Lay the membrane with the specified overlap and slack
  4. Trial-weld at the day's temperature and humidity
  5. Weld production seams and test every seam
  6. Detail penetrations, corners and anchors, then repair and retest

Welding parameters and seam records are supplied with the shipment; an engineer can attend the first production welds for critical projects.

Matching products

Products used in this system

Ask for a material schedule
FAQ

Questions about Hazardous Waste Landfill

What is the typical material build-up?

The package above is a typical starting point. The final layer sequence, thickness and cushion are confirmed against the design head, subgrade and chemical exposure.

How are pipe penetrations and corners sealed?

Pipe boots, reinforced patches and extrusion welds are used at penetrations and corners. These details are agreed before installation, because they are the most common leak paths.

Can you quote from a drawing?

Yes. Send the drawing, specification clauses and bill of quantities. We will map the items to standard products and flag any value that needs a custom run.

Other application scenarios

The same material system behaves differently in each application. Browse the other eleven guides for the layer sequence and details that matter there.

Planning a hazardous waste landfill?

Send the drawing, area, head and exposure. We will propose the layer build-up and a bill of materials.