Factory-direct supply · GB standard · Export packingISO 9001 / ISO 14001 / ISO 45001
Home/Video

Video centre: production lines, welding, project sites and selection

Four groups in the same order as the Chinese video centre: factory and production, installation and welding, project records, and material selection. Seven clips play inside this page; the remaining slots show the planned topic and process cover.

20 topic slots7 playable clips9:16 in-page player
Video centre

1. Factory and production lines

From blown film and calendering to nonwoven, GCL and drainage lines, shown in process order.

Factory tour: blown-film geomembrane line

Factory tour: blown-film geomembrane line

From the factory gate to the blown-film, calendering, nonwoven and lamination lines.

Douyin original
One-stop material supply for a containment project

One-stop material supply for a containment project

Membrane, geotextile, GCL and drainage net produced and packed in the same park.

Douyin original
Five lamination lines in operation

Five lamination lines in operation

Width, peel strength and daily capacity visible on the line.

Douyin original
In-house quality control laboratory

In-house quality control laboratory

Tensile, peel and permeability equipment, with batch sampling in process.

Douyin original
Finished goods warehouse and dispatch

Finished goods warehouse and dispatch

Stock rolls, labelling and container loading at the Dezhou warehouse.

Douyin original
Video centre

2. Installation and welding

From pond lining to double-track hot-wedge welding and T-joints, shown in site order.

Fish pond liner: how the sheet is laid

Fish pond liner: how the sheet is laid

Base, slope and overlap sequence for a lined aquaculture pond.

Douyin original
T-joint and seam treatmentVideo in production

T-joint and seam treatment

How the T-joint is trimmed, patched and recorded before covering.

Seam air-pressure testingVideo in production

Seam air-pressure testing

Double-track seam tested with air pressure and the result logged.

Anchor trench excavation and backfillVideo in production

Anchor trench excavation and backfill

Anchor trench dimensions, backfill and compaction at the liner edge.

Closed-water test and leak investigationVideo in production

Closed-water test and leak investigation

Filling sequence, observation period and how a leak is traced.

Video centre

3. Project site records

Landfill, tailings, reservoir, tank farm and lagoon installation records.

Landfill base liner installation recordVideo in production

Landfill base liner installation record

Base liner placement, seaming and protection layer on a landfill cell.

Tailings dam slope liningVideo in production

Tailings dam slope lining

Slope preparation, anchor and liner placement on a tailings impoundment.

Reservoir lining installationVideo in production

Reservoir lining installation

Reservoir base and slope lining with anchor trenches and protection.

Tank farm bund liningVideo in production

Tank farm bund lining

Bund and base lining for a petrochemical tank farm.

Lagoon full containmentVideo in production

Lagoon full containment

Full lagoon lining with slope protection and perimeter anchoring.

Video centre

4. Selection and material behaviour

Thickness, surface structure, geotextile mass and composite peel strength, explained by application.

Biogas digester black membrane: how to specify

Biogas digester black membrane: how to specify

Thickness, density and cover requirements for a black-membrane digester.

Douyin original
Smooth vs textured geomembraneVideo in production

Smooth vs textured geomembrane

Where smooth sheet is used and when textured sheet is needed for slope friction.

Geotextile mass per unit area and filtrationVideo in production

Geotextile mass per unit area and filtration

How mass per unit area, permeability and opening size are matched to soil.

Composite membrane peel strength explainedVideo in production

Composite membrane peel strength explained

Peel strength, fabric weight and membrane thickness in a composite liner.

Cement blanket installation and curingVideo in production

Cement blanket installation and curing

Roll placement, wetting, curing and traffic timing for a cement blanket.

FAQ

Video questions

Do the videos play inside the page?

Yes. Tapping a cover opens a 9:16 player layer inside the page; closing it returns you to the same scroll position.

Are these factory videos or stock footage?

The production, laboratory and warehouse clips are filmed at the Dezhou factory. Site clips are project footage supplied by Hengyang.

Why are some cards marked video in production?

Those topics are scheduled but not yet filmed. The cover shows the process or material; the card will be replaced when the clip is available.

Can you send a video of a specific process?

Yes. Tell us the line, material or welding step and we will check existing footage or arrange a new clip.

Need a specific process on video?

Tell us the line, material or welding step and we will check existing footage or arrange a clip.

Call +86 400-150-1689 Send project details
Call sales WhatsApp Get quote Products