Factory-direct supply · GB standard · Export packingISO 9001 / ISO 14001 / ISO 45001
Home/Insights/Landfill liner installation checklist
Technical note

Landfill liner installation checklist

Twelve checks from subgrade acceptance to closure cap that determine whether a landfill liner passes its first test.

By the Hengyang technical team · Published 2026-11-21 · Reviewed against GB/T standards and batch test practice

Before delivery

Confirm the design thickness and standard, review mill test certificates, and check roll width against the panel layout. Keep rolls protected from UV and damage on site.

During installation

Accept the subgrade, place the geotextile cushion, control wind uplift, weld with trial-tested parameters, and reinforce every penetration and T-joint.

Before covering and at closure

Complete air or vacuum testing, repair defects, and record seam numbers and locations. Do not cover a seam that has not been tested. Reverse the layer sequence for the cap, protect the GCL from premature hydration, and design surface water diversion before vegetation.

Basis and limits. This note is based on GB/T 17643-2011, GB/T 17642-2008, GB/T 17638-2017 and GB/T 18173.1, together with Hengyang batch test practice. It is general technical guidance, not a design for a specific project. Confirm thickness, layer build-up, welding parameters and acceptance criteria against the project drawing and specification.

Related products

Need a project-specific answer?

Send the drawing and design head. We will check the proposed thickness, cushion and weld detail against the specification.

Ask an engineer

Send your project parameters, get a material schedule and quote

Drawings, head, area and chemical exposure are enough for a first selection. We reply within one working day.

Call +86 400-150-1689 Send project details
Call sales WhatsApp Get quote Products